CHAPTER ONE

1.0                             INTRODUCTION

1.1 BACKGROUND TO STUDY

Material storage and handling is very important part of building construction. That is how easily things flow on building sites. In most cases, site spaces are very well thought out. One thing to consider is that only the important and requisite material and item per time should be stored on site to minimize risk.

Material storage can be defined as the provision of adequate space, protection and control of building materials and components held on site during construction processes. (Chudley 2011). On the other hand material handling can be defined as the provision of proper handling techniques either manually or mechanically for the components held on site during construction processes. Improper storage and handling of building materials on building projects sites could lead to waste which can be caused by inadequacies in supervision and careless attitudes, together with mis-placed incentives. Hence there is need for proper storage and handling of materials, during building construction production process.

According to (Barney 2011) improper handling, storage and lack of adequate security of building material can result to negative change on the construction process and non-completion of projects, on time. (Ammer 2013) opined that material resources are the major constituents of any construction project. This is because the production and distribution activities are general overall performance of any construction will be shaky in the case of under-stock or poor handling and storage of materials. These materials if not properly stored might lead to or result to poor execution of building projects. (Barney 2011) also opined that improper handling and storage and adequate security of building material could result to loss of finances or bring down the financial flow of such project.

There is a problem of reducing or deteriorating out dating, and multiple handling which can be vital to maintaining fluidity of materials on transit to the fixing point or point of usage on site must equally be accepted as storage problem or double handling storage space is often at a premium on construction sites and as

a result material are often poorly stored and insufficient space for subsequent handling, critical activities on site can be delayed by the store officer due to lack of inspection, classification for fault and priority zooming.

Material for constructions (building) constitute a major cost component of any industry therefore should be well stored and handled in order to achieve a successful project (Stukhart 2010).

 

1.2   STATEMENT OF PROBLEM

In construction there are various and enormous variety of materials used during construction of building project. There might be problems associated with the improper methods of storing and handling of materials during construction process. The result of such problems may include, waste of materials and non-completion of projects on time.

Thus this study therefore intends to show methods of materials storage and handling during building production process.

1.3   AIM AND OBJECTIVES

The aim of this study is to achieve effective material storage and handling during building construction process. To achieve this aim the following objectives are considered.

     OBJECTIVES OF STUDY

  1. To look at problems associated with improper storage and handling of material on building construction sites.
  2. To approve how important well stored material contributes to building production process.
  3. To know the methods of material storage and handling suitable during construction process on building construction sites.

1.4   RESEARCH QUESTIONS

  1. What are the methods of material storage and handling during construction?
  2. How does the importance of material storage and handling contributes to the success of building production?

1.5   SCOPE OF STUDY

This research work looked at the methods of storage and handling of building materials used during the process of building construction.  And also the relationship with the work

onsite and the techniques used to store materials in order to achieve the desired aim and objectives of the building project.

1.6   SIGNIFICANCE OF STUDY

Material storage and handling are amongst the most important aspect of any building project. Every builder needs materials in the construction process, to produce quality buildings. It is hoped that, the result of this study will provide avenue where by construction firm, building contractors can improve on their storage system and be able to take advantage of the benefit that are derived from a good storage system. Also, it is expected that those involved in the construction of buildings will find it useful during construction production process.

1.7   STUDY AREA

The study area is Ekpoma which is the head quarter of esan west local government area. Ekpoma located at latitude 6.75 degree north and longitude 6.13degree east has an altitude of 330meters. Ekpoma which has a population of approximately 59,624 people, has more than (24) twenty–four villages and towns some of them are listed below;

Ujemen, Ihumudumun, Uhiele, Idumebo, Uke, Ogwa, Iruekpen, Eguare, Ekpoma, Illeh, Ujoelen.

In the following communities listed above, there is a massive increase in population which has allowed the increase in infrastructural development (residential and commercial buildings), that is ranging from various sizes and shapes.

DOWNLOAD THE FULL WORK

DISCLAIMER: All project works, files and documents posted on this website, UniProjectTopics.com are the property/copyright of their respective owners. They are for research reference/guidance purposes only and some of the works may be crowd-sourced. Please don’t submit someone’s work as your own to avoid plagiarism and its consequences. Use it as a reference/citation/guidance purpose only and not copy the work word for word (verbatim). The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own study. UniProjectTopics.com is a repository of research works where works are uploaded for research guidance. Our aim of providing this work is to help you eradicate the stress of going from one school library to another in search of research materials. This is a legal service because all tertiary institutions permit their students to read previous works, projects, books, articles, journals or papers while developing their own works. This is where the need for literature review comes in. “What a good artist understands is that nothing comes from nowhere. All creative work builds on what came before. Nothing is completely original.” - Austin Kleon. The paid subscription on UniProjectTopics.com is a means by which the website is maintained to support Open Education. If you see your work posted here by any means, and you want it to be removed/credited, please contact us with the web address link to the work. We will reply to and honour every request. Please notice it may take up to 24 – 48 hours to process your request.

WeCreativez WhatsApp Support
Administrator (Online)
I am online and ready to help you via WhatsApp chat. Let me know if you need my assistance.